Brief Description
For the future expansion to the four-platform "Westbahn", new cable runs and signalling facilities had to be constructed between the Traunbrücke bridge and the Linz marshalling yard. Due to the short run-up period (awarded on 02.11.2007, start of construction on 5.11.2007) and the consequent postponement of the main work until the winter, carrying out the work in the short construction time was difficult. Also making work more difficult was the fact that all work had to be carried out in the platform area without interrupting the running of the trains or affecting the existing cabling. The ministerially specified commissioning deadline was adhered to, which was praised by the builder-owners.
Scope of Work
Excavation: approx. 2.100 m³
Platform Crossings: approx. x 80
Cable Laying: approx. 165.000 m
PVC Cable Conduits: approx. 10.000 m
Cable Troughs Sizes I to V: approx. 6,700 m
Signal Foundations: approx. x 100
Side Track Housings: approx. x 370
Builder-Owner
ÖBB - Infrastruktur Bau AG
Business Unit: Projects
Project Management Westbahn Mitte
4020 Linz, Dinghoferstraße 5
Client
Arge VBF Linz, Erweiterung II
5071 Wals, Alte Bundesstraße 10
Performance / AN
Alpine Bau GmbH, Sophiengutstr.20, 4021 Linz 40 %
Held & Francke Bau GmbH, Kotzinastr.4, 4020 Linz 60 %
Contract Price
€ 1.574.000,00 - Arge
€ 951.000,00 - HF
Construction Time
11/2007 – 09/2008
Site Manager H&F
Mr Ing. Christian Hiebl
At Held und Francke the term "further training" is not just an empty phrase. Developing and also challenging personnel is of central importance for us.[more]
H&F and Cteam have become HF Cteam. This group of companies is responsible for overhead pipeline construction in Austria.[more]
With HABAU-FIT FOR A LIFETIME, we are taking an important step in the direction of being fit for work up to a ripe old age.[more]