References > Underground Constr. > Bridge Renovations > Arge A2 Süd Hartberg

Arge A2 Süd Hartberg - Buch

Brief Description
The order comprises the repair of the central reservation drainage, the removal of the central guard rail and replacement with a concrete training wall, repair of the deck of the unfinished floor at Graz and the renovation of various bridge constructions.

Scope of Work
Milling Bit. Layers 22 cm  approx. 15.000 m³
Profiling BT 32  approx. 1.500 to
BTHS 22, 10 cm  approx. 80.500 m²
BTHS 32, 10 cm  approx. 80.500 m²
SMA 11 LKS 3,5 cm  approx. 80.500 m²

Client
ASFINAG SGS Süd
9020 Klagenfurt, Josef – Sablatnig – Straße 245
8010 Graz, Wartingergasse 43
Contact: Mr Ing. Thomas Avender

Contractor
Arge A 2 Hartberg – Buch
Granit – Swietelsky – Held & Francke
8022 Graz, Feldgasse 14

Planning
ASFINAG SGS Süd
8010 Graz, Wartingergasse 43

Contract Price
€ 6.700.000,00 net

Construction Time
04/2007 – 09/2007

Site Manager
Mr Ing. Thomas Stross

Arge Share in Euro / %
HF-Share in € 2.233.000,00 net

A Young Company Introduces Itself

H&F and Cteam have become HF Cteam. This group of companies is responsible for overhead pipeline construction in Austria.[more]

Fit For A Lifetime

With HABAU-FIT FOR A LIFETIME, we are taking an important step in the direction of being fit for work up to a ripe old age.[more]

H&F Never Stands Still

At Held und Francke the term "further training" is not just an empty phrase. Developing and also challenging personnel is of central importance for us.[more]