Brief Description
Road and bridge construction work with a length of 1,750 m. The scope of work includes 3 new bridge constructions and a subsurface roadway in open cut with a length of 1,235 m.
Scope of Work
Open Removal: 260.000 m³
Frost Wall: 19.500 m³
Concrete: 37.000 m³
Concrete Reinforcement Steel: 4.000 to
Asphalt: 9.500 to
Client
Office of the Tyrolean State Government
Road Construction Department
6020 Innsbruck, Herrengasse 1-3
Contact: Mr DI. Dr. Christian Molzer
Contractor
ARGE
Teerag Asdag - Held & Francke
4030 Linz, Kotzinastraße 4
Innsbruck Branch
Planning
DI. Baumann / Obholzer, Technikerstraße 22, 6020 Innsbruck
DI. Köll, Lus 88, 6103 Reith bei Seefeld
DI. Sigl, Claudiastr. 6, 6020 Innsbruck
Contract Price
€ 14,2 Mio. net
Construction Time
August 2004 – October 2007
Site Manager
Mr Ing. Hansjörg Draxl
Arge Share HF in %
50%
With HABAU-FIT FOR A LIFETIME, we are taking an important step in the direction of being fit for work up to a ripe old age.[more]
H&F and Cteam have become HF Cteam. This group of companies is responsible for overhead pipeline construction in Austria.[more]
At Held und Francke the term "further training" is not just an empty phrase. Developing and also challenging personnel is of central importance for us.[more]