WÖRGL / BRUCKHÄUSL - BL 02, B178 Loferer Straße

Brief Description
Road and bridge construction work with a length of 1,750 m. The scope of work includes 3 new bridge constructions and a subsurface roadway in open cut with a length of 1,235 m.

Scope of Work
Open Removal:  260.000 m³
Frost Wall:  19.500 m³
Concrete:  37.000 m³
Concrete Reinforcement Steel:  4.000 to
Asphalt:  9.500 to

Client
Office of the Tyrolean State Government
Road Construction Department
6020 Innsbruck, Herrengasse 1-3
Contact: Mr DI. Dr. Christian Molzer

Contractor
ARGE
Teerag Asdag - Held & Francke
4030 Linz, Kotzinastraße 4
Innsbruck Branch

Planning
DI. Baumann / Obholzer, Technikerstraße 22, 6020 Innsbruck
DI. Köll, Lus 88, 6103 Reith bei Seefeld
DI. Sigl, Claudiastr. 6, 6020 Innsbruck

Contract Price
€ 14,2 Mio. net

Construction Time
August 2004 – October 2007

Site Manager
Mr Ing. Hansjörg Draxl

Arge Share HF in %
50%

Fit For A Lifetime

With HABAU-FIT FOR A LIFETIME, we are taking an important step in the direction of being fit for work up to a ripe old age.[more]

A Young Company Introduces Itself

H&F and Cteam have become HF Cteam. This group of companies is responsible for overhead pipeline construction in Austria.[more]

H&F Never Stands Still

At Held und Francke the term "further training" is not just an empty phrase. Developing and also challenging personnel is of central importance for us.[more]