Brief Description
In the course of laying new tracks (using AHM) on the Linz – Selzthal route, Kematen section at Krems – Kremsmünster, earthworks, the laying of cable troughs and the creation of trench walls, drains and clearings were necessary for construction of the ballast profiles and to ensure the drainage of the railway construction. Furthermore, existing piping outlets and outlet structures were renovated. The very short construction time was a challenge due to which work sometimes had to be carried on through the day and night, and at weekends.
Scope of Work
The construction work comprised the producing of:
rail trenches, slope reinforcements, outlets, trench walls and gutters, drains, cable troughs
Earth Excavation 10.000 m³
Clearings 9.500 m²
Drains 1.500 m1
Trough Shifting 500 m1
Trench Wall 75 m1
2 x Outlets DN 800
Client
ÖBB Infrastruktur Bau AG, Regional Section South 1,
8770 St. Michael, Waldpurgistraße 5
DI Bretterebner / Ing. Helmut Füreder
Contractor
Held & Francke Baugesellschaft m.b.H. & Co KG
4030 Linz, Kotzinastraße 4
Planning
IB Walchhofer, Ingenieurbüro
5020 Salzburg, Herrengasse 14
Contract Price
€ 970.000,00 net
Construction Time
08/2009 – 09/2009
Site Manager
Ms Ing. Gudrun Götsch
Mr Ing. Björn Ortner
H&F and Cteam have become HF Cteam. This group of companies is responsible for overhead pipeline construction in Austria.[more]
With HABAU-FIT FOR A LIFETIME, we are taking an important step in the direction of being fit for work up to a ripe old age.[more]
At Held und Francke the term "further training" is not just an empty phrase. Developing and also challenging personnel is of central importance for us.[more]